TM 10-3930-641-34-2
CARRIAGE REMOVAL/INSTALLATION
(Sheet 1 of 3)
This task covers: Removal and installation of the carriage.
INITIAL SETUP
Test Equipment
Materials/Parts
Troubleshooting Reference
None
None
None
Equipment Condition
Fork assembly removed.
Side shift cylinder removed.
Side tilt cylinder removed.
Shipping link installed.
Special Tools
Personnel Required
None
One mechanic.
References
General Safety Instructions
Fork Assembly Removal/Installation, page 7-87
Tires blocked.
Side Shift Cylinder Removal/Installation,
Side Tilt Cylinder Removal/Installation,
Go on to Sheet 2
7-91