TM 10-3930-675-20-2
0191 00-6
TOPHANDLER REPLACEMENT - CONTINUED
0191 00
INSTALLATION - CONTINUED
5.
Lower boom and position boom extension (11) into tophandler (5), while alining pivot shaft holes in boom extension
with holes in tophandler.
NOTE
Ensure pivot shafts are clean.
When installing pivot shafts, slot in pivot shaft for retaining bolt must be alined with bolt hole in
tophandler.
It may be necessary to connect hydraulic hoses and use boom controls to aid in boom to tophandler
positioning.
6.
Install pivot shaft (10) on each side of tophandler (5). Secure with new lockwasher (13) and bolt (12).
7.
Remove caps/plugs and connect six hydraulic hose quick disconnect fittings (8) to top of tophandler (5).
10
11
5
12,13
8
5