TM 10-3930-675-24-2
ENGINE AIR INTAKE HOSES AND TUBES REPLACEMENT - CONTINUED
0058 00
NOTE
Note position of elbows and tubes to aid in installation.
Remove and discard all hose clamps. Ensure new hose clamps are used on installation.
Metal rings installed over hoses may be replaced as necessary.
AIR CLEANER-TO-TURBOCHARGER HOSES AND TUBES REMOVAL
1.
Loosen six hose clamps (9) and remove elbow (8), 7 -in. tube (11), rubber elbow (12), 4 -in. tube (13), and rubber
elbow (14) from air cleaner (10).
2.
Remove clamp (6) holding 7 -in. tube (7) to bracket (15).
3.
Loosen two hose clamps (4) and remove 7-in. tube (7) and elbow (5) from 25-in. tube (3).
4.
Remove clamp (16) holding 25-in. tube (3) to bracket (17).
5.
Loosen four hose clamps (2) and remove 25-in. tube (3), rubber elbow (1), tube (20), and rubber elbow (19) from turbo-
charger (18).
10
9
8
2
3
1
4
45
67
2
20
2
19
9
17 16
11
9
15
9
12
2
14
18
9
13 9
SIDE VIEW
AIR CLEANER-TO-TURBOCHARGER HOSES AND TUBES INSTALLATION
1.
Install rubber elbow (19), tube (20), rubber elbow (1), and 25-in. tube (3) to turbocharger (18) and tighten four hose
clamps (2).
2.
Install 25-in. tube (3) on bracket (17) with clamp (16).
3.
Install elbow (5) and 7 -in. tube (7) on 25-in. tube (3) and tighten two hose clamps (4).
4.
Install 7 -in. tube (7) on bracket (15) with clamp (6).
CAUTION
Ensure there is clearance between rubber elbow and sheet metal or a hole will develop in rubber elbow.
5.
Install rubber elbow (14), 4 -in. tube (13), rubber elbow (12), 7 -in. tube (11), and elbow (8) on air cleaner (10) and
tighten six hose clamps (9).
0058 00-2