TM 5-3810-306-34
g. From rear of transmission, tap low clutch (71)
20. INSTALL BEARING HOUSING (43).
and six speed idler shaft (64). This will allow
clearance for installing retaining ring (46).
a. Position new gasket (44) on bearing housing
(43).
h. Install piston rings (62).
b. Install bearing housing (43) and secure with four
17. INSTALL GREASE CAP (48).
(42).
a. Install new gasket (51) on grease cap (48).
c.
Torque capscrews (40)and(41) to 82-90 ft-lbs
b. Install grease caps (48) and secure with five
(109-120 Nm ).
bolts and washers (47).
21.
INSTALL FLANGE (39).
c.
Torque bolts and washers (47) to 23-25 ft-lbs
(31-33 Nm ).
a. Install flange (39) with new preformed packing
(38).
18. INSTALL RETAINING RING (46) AND SPACER
(63a).
b. Secure with washer (37) and nut (36).
19. INSTALL NUT (45).
c.
Block output shaft.
a. Install nut (45) on six speed idler shaft and gear
d. Torque nut (36) 200-250 lbs-ft (266-333 Nm ).
(64).
22. INSTALL FORWARD AND SECOND CLUTCH
b. Block idler gear and torque nut 400-450 ft-lbs
ROLLER (71a).
(532-600 Nm ).
a. Install roller (71a) in rear of forward and second
clutch shaft (35).
7-54