TM 9-3950-253-13&P
0060
Table 1. Operator Preventive Maintenance Checks and Services (PMCS), Including Lubrication
Instructions for the E-CHU - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
Figure 14. Lift Frame Lubrication.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.10)root(pmcswp)wpno(I582059)