TM 10-3930-641-20
(Sheet 2 of 2)
SHIPPING LINK REMOVAL/INSTALLATION (CONT)
LOCATION/ITEM
ACTION
REMARKS
Remove.
1. Cotter pin (1)
Remove.
2. Retaining pin (2)
Place in storage position.
3. Shipping link (3)
Install.
4. Retaining pin (2) and cotter
pin (3)
INSTALLATION
Remove.
1. Cotter pin (1) and retaining pin (2)
Remove from storage position and fasten to
2. Shipping link (3)
retaining plates.
Place in position.
3. Retaining pin (2)
Install.
4. Cotter pin (1)
End
2-472