TM 10-3930-641-34-1
TURBOCHARGER AIR LINES REMOVAL/INSTALLATION
(Sheet 1 of 4)
This task covers: Removal and installation of turbocharger air lines.
INITIAL SETUP
Test Equipment
Materials/Parts
Troubleshooting Reference
None
As required
Page 2-8
Equipment Condition
Engine cool
Special Tools
Personnel Required
Hoist
One mechanic
References
General Safety Instructions
Turbocharger removal/installation,
Main disconnect switch OFF.
page 3-107.
Go on to Sheet 2
3-124