TM 10-3930-675-100005 00-31OPERATION UNDER USUAL CONDITIONS - CONTINUED0005 00FORKLIFT KIT INSTALLATION - CONTINUEDn.Retract the boom and level the forklift kit using the joystick tilt control.NOTERetaining pins should be installed from the outside.o.Install retaining pins and locking pins to secure forks to upper fork arms.FORKLIFTKITLOCKINGRETAININGLOCKINGPINPINUPPER FORKARMFORKPIN
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business