TM 10-3930-675-24-2
TOPHANDLER REPLACEMENT - CONTINUED
0189 00
INSTALLATION - CONTINUED
14.
Raise boom and tophandler off trailer and back RTCH away from trailer.
15.
Place boom back into operational position (TM 10-3930-675-10):
a.
Extend the boom to 110 in. (279.4 cm).
b.
Rotate tophandler 90 degrees counterclockwise to operational position.
c.
Raise boom and tophandler 12 to 13 ft (3.7 to 4.0 m) off the ground.
d.
Retract locking pins fully.
e.
Raise boom support fully.
f.
Check boom angle and readjust to 19 degrees.
g.
Extend boom support locking pins.
h.
Return cab to operational position (TM 10-3930-675-10).
i.
Install boom support locking pin retaining pins.
16.
CERTIFICATION OF INSPECTION
1.
If tophandler was replaced, RTCH must be load tested and certified.
2.
A tophandler that was removed and reinstalled from one RTCH does not have to be re-certified.
END OF WORK PACKAGE
0189 00-15/(0189 00-16 Blank)