TM 10-3930-675-24-2
LOAD TESTING PROCEDURE - CONTINUED
0291 00
EXTENSION CYLINDER DRIFT TEST - CONTINUED
434-40154
434-40153
10.
Note time when making reference point and record these readings:
a.
Time.
b.
Ambient temperature (third operator screen).
c.
Boom extension (fifth operator screen).
d.
Hydraulic temperature (third operator screen).
11.
Record readings every 5 minutes for 20 minutes.
12.
Maximum drift allowed in 20 minutes is 1 in. (30 cm).
Reference Readings 2
Item
5
10
15
20
13.
If test is failed, notify Sustainment Maintenance.
END OF WORK PACKAGE
0291 00-5/(0291 00-6 Blank)