Section II. MAINTENANCE ALLOCATION CHART FOR
CONTAINER, SERVICE WARD, RIGID CONSTRUCTION
(1)
(4)
(2)
(3)
(5)
(6)
GROUP
MAINTENANCE LEVEL
COMPONENT/
MAINTENANCE
TOOLS AND
REMARKS
NUMBER
ASSEMBLY
FUNCTION
EQUIPMENT
CODE
REFERENCE
FIELD
SUSTAINMENT
CODE
DIRECT
GENERAL
DEPOT
UNIT
SUPPORT
SUPPORT
C
O
F
H
D
5401
SHELTER BODY
Inspect
0.2
ASSY
Test
0.2
Service
0.6
Install
2.0
1
Replace
1.5
1
Repair
2.0
1
A
Overhaul
6.0
1
A
5405
SHELTER
Inspect
0.5
ACCESSORIES
Test
0.6
Service
1.0
Install
2.0
1
Replace
1.5
1
Repair
1.0
1
B
Overhaul
2.0
1
Section III. TOOLS AND TEST EQUIPMENT FOR
CONTAINER, SERVICE WARD, RIGID CONSTRUCTION
(1)
(2)
(3)
(4)
(5)
TOOL OR TEST
MAINTENANCE
NOMENCLATURE
NATIONAL STOCK
TOOL NUMBER
EQUIPMENT
LEVEL
NUMBER
REFERENCE
CODE
1
O, F, H
Pop Rivet Tools, Plier Type, with 1/8 inch and
3/16 inch diameter heads. For application of
1/8 and 3/16 inch diameter Pop Rivets
Section IV. REMARKS FOR
CONTAINER, SERVICE WARD, RIGID CONSTRUCTION
(1)
(2)
REMARKS
REMARKS
CODE
A-I
All seals to prevent air leakage must be replaced every 12 months. Plus the entire shelter will be repainted interior and
exterior.
A-J
Same info for A-I.
B-I
Machine sewing at Direct Support Level for the airlock assembly.
Change 1
B-5/(B-6 Blank)