TM 5-3810-306-34
2. CONNECT HYDRAULIC AND AIR LINES TO
SWIVEL (7).
a. Join 22 tagged quick disconnect couplers to
bottom of swivel. Tighten hose to steer relief
valve as necessary.
b. Install twelve lines to hydraulic swivel. Use new
preformed packings and coat threads with
Loctite 545.
c. Install twelve lines to air/transmission swivel.
Use new preformed packings and coat threads
with Loctite 545.
3. CONNECT
FOUR
TAGGED
ELECTRICAL
CONNECTORS (1) TO ELECTRICAL SWIVEL.
4. CONNECT
THREE
TAGGED
ELECTRICAL
CONNECTORS TO CARRIER HARNESS.
5. CONNECT TWO ROD AND LINK ASSEMBLIES (4).
a. Align hole in yoke with hole in ear on swivel
barrel. Install hitch clip pins (6) and secure with
new cotter pins (5).
6. CONNECT TAGGED
WIRES
(13)
TO
AREA
DEFINITION SWITCH.
7. CONNECT NEGATIVE BATTERY CABLE
AT
SHUNT. (REFER TO TM 5-3810-306-20.)
8. REMOVE BLOCKING FROM LIFT CYLINDER.
9. START
CRANE.
TEST
FOR
PROPER
OPERATION AND INSPECT FOR LEAKS.
END OF TASK
15-74