TM 10-3930-675-24-2
SLAVE STARTING RECEPTACLE REPLACEMENT
THIS WORK PACKAGE COVERS
Right Slave Starting Receptacle: Removal, Installation
Left Slave Starting Receptacle: Removal, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Organizational
Nut, lock (P/N 920076.001) (8)
Tools and Special Tools
Nut, lock (P/N 920076.003) (4)
Tool Kit, General Mechanic's (Item 128, WP 0289
Equipment Condition
Master battery switch in OFF position
Materials/Parts
NOTE
Tag cables to ensure correct installation.
RIGHT SLAVE STARTING RECEPTACLE REMOVAL
1.
Remove cap (1) from slave starting receptacle (2).
2.
Remove four locknuts (3), eight washers (4), four screws (5), and bracket (6) from vehicle. Pull bracket downward to
access rear of slave starting receptacle (2). Discard locknuts.
1,2
3,4,5
6