TM 10-3930-675-24-2
TRANSMISSION OIL COOLER REPLACEMENT - CONTINUED
0226 00
INSTALLATION - CONTINUED
19
19
20
12
18
13
18
4.
Install two hoses (10 and 15) on top of transmission oil cooler upper unit (12) with two new O-ring seals (9) and flanges
(7). Secure flanges with eight screws (8).
5.
Install two hoses (14 and 15) on bottom of transmission oil cooler lower unit (13) with two new O-ring seals (9) and
flanges (7). Secure flanges with eight screws (8).
6.
Apply pipe sealant to fitting (17) and install fitting in transmission oil cooler upper unit (12). Connect water hose (11) to
fitting with hose clamp (16).
7.
Install coolant hose (5) and secure with two hose clamps (6).
7,8,9
6
5
10
7,8,9
11
12
13
7,8,9
14
15
16,17