TM 5-3810-306-34
e. Position solenoid coil (7) on valve body and
NOTE
secure with plate (6) and four screws (26).
Tighten screws.
Replace all preformed packings.
Coat all parts with hydraulic oil
f. Assemble valve bodies, plates (3) and new
before reassembly.
preformed packings (4) on tie bolts (5).
a. Install new preformed packings (15) and (16),
g. Position two mounting brackets (2) on each end
sleeves (17) and (18), spring (19) and cone (20)
of valve bank and secure with nuts (1). Torque
on plunger (21) and insert in solenoid coil.
nuts (1) to 125 in-lbs (14 Nm).
b. Install quad ring (24) on pin (23). Install pin (23),
h. Coat threads of fittings with Loctite #545 and
guide (22) and new preformed packing (25).
install on valves.
c. Install spring (11), washer (13), spool (12) and
2.
INSTALL CONTROL VALVE. (REFER TO TM 5-
spring (14) in valve body.
3810-306-20.)
d. Install new preformed packing (9) on plug (8)
END OF TASK
and tighten in end of valve body.
13-75