TM10-3930-641-34-2
TRANSMISSION CONTROL LOCK BENCH TEST
(Sheet 2 of 3)
LOCATION/ITEM
ACTION
REMARKS
1.
Pressure oil
Find a scourse of supply that will provide
2
650 psi (45.7 Kg/cm ). A transmission test
bench is satisfactory.
2.
Gage, needle valve, and lines
Connect as shown at right.
NOTE
Because the flow needed for this test is low,
be sure the length of the lines used is kept to
a minimum so pressure differences (drops)
are kept to a minimum.
3.
Needle valve
Open slowly.
TA099391
Go on to Sheet 3
4-235