TM 10-3930-641-34-2
TEE TEST PROCEDURE FOR HYDRAULIC SYSTEM (CONT)
(Sheet 26 of 27)
LOCATION/ITEM
ACTION
REMARKS
3.
Manual control valve
Close slowly until you get 1000 psi (703 kgs/
sq. meter).
4.
Flow rate (gpm)
Record.
TEST 32
TEMPERATURE
1.
Manual load valve
Open fully.
2.
Engine
Run at any rpm.
3.
Control lever
Move to LOWER position.
4.
Oil temperature
Record.
WARNING
All pressure in the lines must be released or
injury to personnel and damage to equipment
can result when the lines are loosened to install
or remove plate assemblies. The implements
can move and pressure oil can be released.
Go on to Sheet 27
7-149