TM 10-3930-675-10-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - CONTINUED
0013 00
Table 1. Preventive Maintenance Checks and
Services (PMCS) for RTCH-RT 240V2 - Continued.
LOCATION
ITEM TO
ITEM
CHECK/
NOT FULLY MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
64
Monthly
Solar
a. Clean solar panel to remove dirt, dust,
Maintenance
and debris that can reduce solar effi-
Charger
ciency.
b. Wipe with a soft cloth and water. Do
not use cleaning chemicals.
c. Check all electrical connections and
tighten if necessary.
d. When the RTCH is going to be parked
for an extended period, orient equip-
ment to obtain maximum sunlight
exposure on the solar panel, if possible.
Visually inspect the grease level in the
65
Monthly
Automatic
clear bowl on top of the lubricator system.
Lubrication
System
If the bowl is less than 1/4 full, fill with
Grease, Automotive and Artillery GAA
(Item 7, WP 0019 00) through the grease
fitting located at the base of the bowl. If it
appears that the system is not functioning
properly, notify Organizational
Maintenance. They should perform a
functional test on the system.
GREASE
LEVEL
FILL
FITTING
COVER
PLUG FOR
TEST POINT
374M-0049
END OF WORK PACKAGE
0013 00-23/(0013 00-24 Blank)