TM 10-3930-675-10
0013 00-3
Table 1. Preventive Maintenance Checks and
Services (PMCS) for RTCH-RT 240 - Continued.
ITEM
NO.
INTERVAL
LOCATION
PROCEDURE
NOT FULLY MISSION
CAPABLE IF:
ITEM TO
CHECK/
SERVICE
9
Before
Hydraulic
Reservoir and
Sight Gage
a. Check for damage and leaks.
a. Class III leaks are evident.
NOTE
Boom must be fully lowered and retracted and truck on level
ground before checking hydraulic oil level in reservoir. Engine
should be stopped at least five minutes.
b. Check hydraulic oil in oil level sight
gage. If hydraulic oil is visible in
sight gage, level is okay. If level is
low, add oil IAW instructions in LO
10-3930-675-12.
b. Hydraulic oil level is below
sight gage.
LIFTING
BOOM AND
TOP-
HANDLER
10
Before
Boom
Hydraulics
Check hydraulic cylinders, hoses,
lines, and fittings for damage and
leaks.
Class III leaks are evident.
11
Before
Tophandler
Hydraulics
Check hydraulic cylinders, hoses,
lines, and fittings for damage and
leaks.
Class III leaks are evident.
HYDRAULIC RESERVOIR
SIGHT
GAGE
FILL
POINT