TM 5-3810-306-34
e. Check flowmeter at output side of priority
NOTE
valve (28). Loosen jam nut (33) and turn
adjusting screw (37) as necessary to
If pump becomes hot to touch, it is
obtain 15 GPM flow. Tighten jam nut (33).
binding and may seize. Disassemble
and ensure freedom from binding.
16. INSTALL TWO-SECTION PUMP. (REFER TO
c. Gradually increase pressure on pump,
intermittently, until desired test pressure is
END OF TASK
reached. This should take about five
minutes.
d. Inspect for leakage.
13-38