TM 5-3810-306-34
c.
Install new packing (10) on plug (9) and install
into holding valve (1).
d. Install and tighten hydraulic line (8).
3. CONNECT NEGATIVE BATTERY CABLE
AT
SHUNT. (REFER TO TM 5-3810-306-20.)
4. START UP HYDRAULIC SYSTEM TO NORMAL
PRESSURE. (REFER TO TM 5-3810-306-10.)
5. TEST FOR PROPER OPERATION AND INSPECT
FOR LEAKS.
END OF TASK
13-101