TM 5-3810-306-34
a. Connect fittings (4) and new preformed packing
WARNING
(5) to motor drain tube and tighten to secure.
Counterweight (8) and hoist weigh
b. Connect fitting (6) and new preformed packing
approximately
14,300
pounds
(7) to case drain tube and tighten to secure.
(6486.37 kg). Use care when lifting
and transporting.
c.
Install new preformed packing (3) and connect
fittings (2) on steel tubes at left side of auxiliary
b. Raise
and
position
counterweight
on
hoist (1).
superstructure. Install four capscrews (9) and
washers (10).
4. CONNECT NEGATIVE BATTERY CABLE
AT
SHUNT. (REFER TO TM 5-3810-306-20.)
c.
Using a suitable torque wrench,
capscrews to 3000 ft-lbs (4000 Nm).
5. INSTALL WIRE ROPE TO HOIST DRUM. (REFER
TO TM 5-3810-306-20.)
3. CONNECT HYDRAULIC LINES.
6. TEST FOR PROPER OPERATION.
NOTE
END OF TASK
Prior to installing new preformed
packings, coat packings with clean
hydraulic oil. Coat pipe threads with
Loctite 545.
15-32