TM 5-3810-306-34
c.
Apply Loctite #242 to bolt threads (26). Secure
d. Connect lines (10), (11) and (12) using new
hoist motors (1) to hoist with bolts (26) and new
packings (29) to hoist brake (2).
(200 Nm).
e. Install line (8) and new packings (9) between
bottom-right hoist motor (1) and drain tube.
2. INSTALL HYDRAULIC LINES AND TUBES.
a. Install line (24) and new packings (25) between
eight capscrews (3) to secure tubes (5) and (6)
hoist motors (1).
to tube (16) and hoist motor control valve.
b. Position lines and tubes assembly and install
3. CONNECT NEGATIVE BATTERY CABLE
AT
spacer (22), new lockwasher (20), washer (21)
SHUNT. (REFER TO TM 5-3810-306-20.)
and capscrew (19) through bracket (23).
4. OPERATE HOIST AND CHECK FOR PROPER
c.
Install new packings (18), new lockwashers (15),
OPERATION AND LEAKS.
and sixteen capscrews (14) to secure tubes (16)
and (17) to hoist motors (1).
END OF TASK
15-52