TM 5-3810-306-34
d. Exert downward pressure on collector core
h. After collector ring harness is routed
and brush assembly until springs are
through hydraulic and air/transmission
compressed .5 to .75 in. (1.27 to 1.91
swivel connect previously tagged wires to
cm). Tighten three setscrews to secure
connectors (14), (15) and (16).
collector core to center post.
i. Connect carrier and superstructure wiring
harnesses as tagged.
into mounting plate and secure with
locknuts.
3. CONNECT NEGATIVE BATTERY CABLE AT
SHUNT. (REFER TO TM 5-3810-306-20.)
f. Install superstructure harness No.
4
connector into mounting plate and secure
4. REMOVE BLOCKING FROM LIFT CYLINDERS.
and nuts.
5. CHECK FOR PROPER OPERATION.
g. Install swivel cover (4), seals (5) and (12),
END OF TASK
(3).
15-98