TM 55-8145-201-14
5-6. FLOOR PANEL REPLACEMENT.
This task consists of:
a. Removal
b. Installation
INITIAL SET-UP:
Tools:
Container nut (138) (Item 26, App F)
General Mechanics Tool Kit (Item 4, App B)
Personnel Required:
Portable Drill (Item 2, App B)
Two
References:
TM 9-4110-252-14
TM 5-6115-585-12/34
Equipment Condition :
Refrigeration unit shutdown (TM 9-4110-252-14)
Material/Parts:
Container Bolt (138) (Item 27, App F)
a. Removal.
(1) Remove twenty-one bolts (5), fourteen screws (6), and zee plate (4) from floor panel (1) and container frame
(3).
(2) Carefully pry zee plate (4) from container frame (3) and floor panel (1).
(3) Remove insulation (7) from space between floor panel (1) and container frame (3) at door opening.
(4) Using torx bit and socket, remove 138 container nuts (2) and bolts (8) from floor panel (1).
(5) Push up on floor panel (1) to break seal between panel and container frame (3).
WARNING
Floor panel is heavy/difficult to handle. Use two
personnel when removing floor panel.
(6) Connect hoist and sling to floor panel (1).
(7) Remove floor panel (1) from container frame (3).
(8) Scrape old sealant tape (9) and sealant from container frame (3) and floor panel (1) sealing surfaces.
5-16