TM 10-3930-675-10-2
PREPARATION FOR TRANSPORT
NOTE
In order to prepare the RTCH-RT 240V2 for transport, all procedures in this work package, except
for Self-Deployment, require that the boom support be lowered. The boom support cannot be lowered
unless the cab has first been placed in transport position (to the left and fully lowered).
SELF-DEPLOYMENT
0007 00
WARNING
While operating a RTCH in self-deployment, 2-wheel steering mode, the maximum travel speed of 23
mph (37 kph) should never be exceeded. When on downhill grades, extra care should be exercised not
to allow the RTCH to coast into an over speed condition, in excess of 23 mph (37 kph). Failure to keep
maximum speed at or below 23 mph (37 kph) could result in major damage to the drive train compo-
nents and loss of operator control. Under no circumstances should the parking brake be applied to
attempt to rapidly reduce RTCH speed.
NOTE
The RTCH may be deployed with forklift kit attached only when moving between remote areas,
NOT on highways or streets. Forklift kit may only be deployed with tophandler oriented in nor-
mal operational position, NOT longitudinal position. With forklift kit attached, overall lowered
height of vehicle is increased by 3 ft (0.9 m). This makes the lowered height (with clearance under
forklift kit) approximately 16 ft 1 in. (4.9 m). This height is acceptable for movement between
remote areas but not for highway and/or street movement, due to overhead wires and structures.
Refer to data plate on forklift kit for rail or trailer transport instructions.
trols, indicators, and components.
1.
Extend boom 150 in. load center (load weight screen).
2.
Rotate tophandler 90 degrees clockwise to longitudinal position.
3.
Fully lower boom to the lowest position and tilt the tophandler to a level position parallel with the ground.
CROSSMEMBER
CLAMP 3
374-0028M