TM 10-3930-641-34-2
TORQUE CONVERTER ASSEMBLY (CONT)
(Sheet 15 of 15)
LOCATION/ITEM
ACTION
REMARKS
44. Large preformed packing (12) and
Install in carrier.
small performed packing (15)
45. Shaft (19) and carrier
a. Install in torque converter.
to secure unit.
46. Two performed packing (27)
Install on carrier assembly (62).
47. Yoke (8), retainer (9) and
a. Install on end of shaft.
canscrew (10)
b. Tighten yoke capscrew to a torque of
80-90 lb. ft. (109-121 N-m).
48. Cover (2)
a. Fasten to hoist.
b. Put in position over torque converter.
49. Eleven cover capscrews (22) and
Install.
TA099252
End
4-41