TM 10-3930-641-34-2
SEQUENCE AND PRESSURE CONTROL VALVE REMOVAL/INSTALLATION
(Sheet 1 of 3)
This task covers: Removal of sequence and pressure control valve.
INITIAL SETUP
Test Equipment
Materials/Parts
Troubleshooting Reference
None As required
Page 2-49
Equipment Condition
Engine OFF.
Shipping link installed.
Special Tools
Personnel Required
None
One mechanic
References
General Safety Instructions
Shipping link removal/installation,
Tires blocked.
TM 10-3930-641-20.
Main disconnect switch off.
Go on to Sheet 2
4-202