TM 10-3930-641-34-2
SEQUENCE AND PRESSURE CONTROL VALVE REMOVAL/INSTALLATION (CONT)
(Sheet 3 of 3)
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION
1.
Sequence and pressure control
Put valve (1) in position on rear of torque
valve
converter.
2.
Three capscrews (2)
Install to secure valve.
3.
Wire (3)
Connect to valve.
4.
Hose assembly (4)
Connect to valve.
5.
Two panels (5)
Install.
TA099377
END
4-204