TM 10-3930-641-34-2
FINAL DRIVE PLANET CARRIERS REMOVAL/INSTALLATION (CONT)
LOCATION/ITEM
ACTION
REMARKS
6. Drive axle
Attach hoist and remove after carrier is
installed.
7. Thirty-four nuts and washers
Install.
NOTE
Tighten nuts to a torque of 335 to 445 lb. ft.
(454-607.3 N-m).
8. Drain plug
Install.
9. Drive axles
Install.
10. Final drive
Add oil.
See LO10-3930-641-12.
End
4-258