TM 10-3930-641-34-2
FINAL DRIVE PLANET CARRIERS REMOVAL/INSTALLATION
(Sheet 1 of 5)
This task covers: Removal and installation of final drive planet carriers.
INITIAL SETUP
Test Equipment
Materials/Parts
Troubleshooting Reference
None
As required
Pages 2-43, 2-44
Equipment Condition
Drive axles removed.
Shipping link installed.
Special Tools
Personnel Required
None
Two mechanics
References
General Safety Instructions
LO 10-3930-641-20.
Tires blocked.
Shipping link removal/installation,
TM 10-3930-641-20.
Go on to Sheet 2
4-254