TM 10-3930-641-34-2
TEE TEST PROCEDURE FOR STEERING SYSTEM (CONT)
(Sheet 4 of 24)
CHART A. SYSTEM TEST
Maximum
System
System
Lift
Lift
System
Pressure
Oil
Base
LOWER
RAISE
Oil
Test
Relief Valve
Temperature
Flow
Flow
Flow
Temperature
Name
Setting
(Start)
Rate
Rate
Rate
(End)
Test
1
2
3
4
5
6
Number
Control
Steer
Steer
Steer
Steer
Steer
Steer
Lever
Right
Right
Right
Right
Left
Right
Position
Mast
Fully
Fully
Fully
Fully
Fully
Fully
Position
Lowered
Lowered
Lowered
Lowered
Lowered
Engine
2000
Any
2000
2000
2000
Any
Speed
RPM
Speed
RPM
RPM
RPM
Speed
System
0-100
100
1000
1000
0-100
Test
Maximum
PSI
PSI
PSI
PSI
PSI
Pressure
2500
150
150
75
6
5
Test
90.0
77.0
77.0
0
Data
PSI
OF
GPM
GPM
GPM
F
(3-4)
(3-5)
Flow
13.0
13.0
Differential
GPM
GPM
(3-4) x 100
(3-5) x 100
3
3
Percent
15%
15%
Flow Loss
NOTE: Connect shipping link before tests are made.
Go on to Sheet 5
6-100