TM 10-3930-675-10-1
PREPARATION FOR TRANSPORT - CONTINUED
0007 00
RAIL TRANSPORT - CONTINUED
k. At side of locking valve at base of each lift cylinder, loosen float valve jamnut and turn float valve screw five turns
counterclockwise. Retighten jamnut to prevent loss.
LOCKING VALVE
VALVE SCREW
JAMNUT
l. Open both shutoff valves #6 slowly and at the same time.
SHUTOFF
VALVES #6
m.Secure RTCH to rail flatcar IAW tiedown instructions on RTCH data plate and on rail flatcar.
0007 00-12