TM 10-3930-675-10-2
PREPARATION FOR TRANSPORT - CONTINUED
0007 00
PLACING BOOM SUPPORT IN TRANSPORT POSITION - CONTINUED
CAUTION
DO NOT operate locking pin lever and folding boom support lever at the same time. If levers are
operated at the same time, boom support locking pin extensions may shear.
NOTE
Left and right boom support locking pins may not extend at the same time. Keep pulling locking pin
lever until they both extend. Locking pins may also be difficult to extend. It may be necessary to raise
the boom folding support to aid in releasing boom support locking pins.
h. Ensure boom is raised to 19-degrees and extended to 110 in. (279 cm) degrees to extension.
LOCKING PINS LEVER
CAB SIDE
MOVEMENT
LEVER
FOLDING BOOM
SUPPORT LEVER
CAB
LIFT/LOWER
LEVER
BOGIE WHEEL
PRESSURE VALVE
BOGIE WHEELS
LEVER
374M-0011
i. Pull folding boom support lever to ensure boom support is fully raised.
j. Pull locking pin lever to extend boom support locking pins.
k. Install retaining pin in left and right boom support locking pin extensions.
l. Close and latch door of remote hydraulic control compartment.
0007 00-10