TM 10-3930-675-10-2
PREPARATION FOR TRANSPORT - CONTINUED
0007 00
RAIL TRANSPORT
0007 00
NOTE
indicators, and components.
Load RTCH on Rail Flatcar.
1.
a. Drive RTCH, with tophandler attached, onto rail flatcar (MIL-STD-1366C).
b. Place boom in operational position and raise to 19 degrees as shown on ECS display screen.
c. Extend boom to 110 in. (279 cm) as shown on ECS display screen.
d. Move cab to transport position. Refer to Placing Cab in Transport Position in this work package.
e. Fold boom support to transport position. Refer to Placing Boom Support in Transport Position in this work package.
f. Lower boom below 15 degrees and rotate tophandler 90 degrees clockwise to longitudinal position.
g. Lower and retract boom until tophandler is located as close to machine front wheels as possible.
h. Place four pieces of shoring (4 x 4, 6 x 6, etc.) under tophandler. DO NOT set under sensor plungers next to twistlock
or place on tophandler transport support block.
i. Lower tophandler onto shoring. Ensure tophandler leveling cylinders fully collapse when tophandler is lowered.
j. Shut down RTCH engine.
k. At side of locking valve at base of each lift cylinder, loosen float valve jamnut and turn float valve screw five turns
counterclockwise. Retighten jamnut to prevent loss.
LOCKING VALVE
350-1368
VALVE SCREW
JAMNUT
0007 00-14