TM 10-3930-675-100007 00-10PREPARATION FOR TRANSPORT - CONTINUED0007 00RAIL TRANSPORTNOTERefer to WP 0002 00, 0004 00, and 0005 00 for the location and operation of RTCH controls, indicators, andcomponents.1.LoadRTCHonRailFlatcar.a.Drive RTCH, with tophandler attached, onto rail flatcar (MIL-STD-1366C).b.Raise boom to 19° as shown on ECS display screen.c.Extend boom to 96.5 in (2450 mm) as shown on ECS display screen.d.Move cab to transport position (refer to Placing Cab in Transport Position).e.Fold boom support (refer to Placing Boom Support in Transport Position).f.Rotate tophandler 90° clockwise to longitudinal position.g.Lower and retract boom until tophandler is located as close to vehicle front wheels as possible.h.Place shoring (4 X 4, 6 X 6, etc.) under tophandler.i.Lower tophandler onto shoring. Ensure tophandler leveling cylinders fully collapse when tophandler is lowered.j.Shut down RTCH engine.k.At side of locking valve at base of each lift cylinder, loosen float valve jamnut and turn float valve screw five turnscounterclockwise. Retighten jamnut to prevent loss.VALVE SCREWJAM-NUTLOCKINGVALVE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business