TM 10-3930-675-20-2
0169 00-1
CONTROL VALVE SOLENOIDS REPLACEMENT
0169 00
THIS WORK PACKAGE COVERS
Type A Solenoid: Removal, Installation
Type B Solenoid: Removal, Installation
Type C Solenoid: Removal, Installation
INITIAL SETUP
Tools and Special Tools
Tool kit, general mechanics (Item 31, WP 0204 00)
Key set, socket head screw (Item 15, WP 0204 00)
Materials/Parts
Tag, marker (Item 28, WP 0203 00)
Seal kit (P/N 923828.0012)
Equipment Condition
Master battery switch in OFF position
NOTE
There are three basic types of solenoids located on control valves throughout the RTCH. Replacement
of each type of solenoid is described in this work package.
Tag connectors to ensure correct installation.
TYPE A SOLENOID REMOVAL
NOTE
Perform following steps for each of 12 solenoids to be removed.
1.
Press in on retaining clip (6) on side of connector (1) and disconnect connector of tophandler wiring harness from sole-
noid (4).
2.
Remove two screws (2) and solenoid (4) from control valve (3).
3.
Remove o-ring (5) from solenoid (4). Discard o-ring.
1
2
3
4
5
6