TM 10-3930-675-24-2
TOPHANDLER REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Materials/Parts - Continued
Maintenance Level
Organizational
4 x 4-in. Cribbing Materials
Tools and Special Tools
4 x 4-in. Oak 12 in. Long
Tool Kit, General Mechanic's (Item 128, WP 0289
Washer, lock (P/N 923657.0001) (2)
Jackscrew (2) (TM 10-3930-675-10, Basic Issue
Washer, lock (P/N 923657.0004) (2)
Items)
Personnel Required
Materials/Parts
Grease, Automotive and Artillery, GAA (Item 20,
Three
Oil, Lubricating, OE/HDO 10 (Item 26, WP 0290
References
CAUTION
DO NOT extend the boom support locking pins into the frame with the tophandler removed from
the boom.
Damage to boom support and frame slide bearings can occur if the boom support locking pins are
extended or retracted into the operational/locked position when the tophandler is removed from
the boom.
NOTE
The tophandler can be removed onto a trailer at least 50-in. (127 cm) high without placing the boom
in the transport position.