TM 5-3810-306-34
4.
INSTALL COVER (3).
5.
CONNECT NEGATIVE BATTERY CABLE AT
SHUNT. (REFER TO TM 5-3810-306-20.)
a. Position cover (3) over oil cooler assembly and
secure to superstructure using two capscrews
6.
DRAIN AND FLUSH HYDRAULIC SYSTEM.
(1).
7.
BLEED AIR FROM HYDRAULIC
SYSTEM.
b. Secure cover (3) sides to frame (13) with eight
capscrews (9).
8.
START UP HYDRAULIC SYSTEM AND CHECK
FOR PROPER OPERATION AND LEAKS.
END OF TASK
13-51