• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 279 of 720
'Unknown' by Unknown - Page 281 of 720

PALLETIZED LOAD SYSTEM TRUCK, M1075 AND M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 ENHANCED CONTAINER HANDLING UNIT
Page Navigation
  201    202    203    204    205  206  207    208    209    210    211  
img
.
TM 9-3950-253-13&P
0060
Table 1. Operator Preventive Maintenance Checks and Services (PMCS), Including Lubrication
Instructions for the E-CHU.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
NOTE
Review all WARNINGs,
CAUTIONs, and NOTEs before
performing PMCS on the E-CHU.
If you are operating E-CHU for the
first time, perform your Weekly
and Monthly PMCS the first time
you do your Before PMCS.
If performing Weekly PMCS and
E-CHU has not been operated in
a week, perform Before PMCS at
the same time.
If performing Monthly PMCS and
E-CHU has not been operated in
a month, perform After PMCS at
the same time.
Unless otherwise indicated,
perform preventive maintenance
and lubrication with vehicle
parked on level ground, engine
shut down, and parking brake
applied.
Begin walkaround inspection at
left side of stowage assembly and
proceed in a counterclockwise
direction.
1
Before
Stowage
1. Check for hydraulic fluid under stowage assembly.
Any Class III hydraulic
Assembly Left
If hydraulic fluid is found, identify source of leak.
fluid leaks are visible.
Side - Overall
View
2. Check stowage assembly for signs of damage and
Stowage assembly
missing parts.
inoperative due to
damage or missing parts.
3. Remove any dirt or debris in and around stowage
assembly.
0060-2
03/15/2011Rel(1.10)root(pmcswp)wpno(I582059)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.