• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 283 of 720
'Unknown' by Unknown - Page 285 of 720

PALLETIZED LOAD SYSTEM TRUCK, M1075 AND M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 ENHANCED CONTAINER HANDLING UNIT
Page Navigation
  205    206    207    208    209  210  211    212    213    214    215  
img
.
TM 9-3950-253-13&P
0060
Table 1. Operator Preventive Maintenance Checks and Services (PMCS), Including Lubrication
Instructions for the E-CHU - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
Figure 4. Left Twistlock Assembly.
8
Before
Slider Assembly
Check slider beam for excessive damage/wear, cracks, Slider beam is
Rear - Slider
and loose or missing hardware.
excessively damaged/
Beam
worn, cracked, or
hardware is loose or
missing.
9
Before
Slider Assembly  Rotate horizontal and angled rollers to verify that
Rear - Horizontal rollers rotate freely. Notify Field Maintenance if one or
and Angled
more rollers do not rotate freely.
Rollers
10
Before
Slider Assembly
Check main pivot for excessive damage/wear, cracks,
Main pivot is excessively
Rear - Main
and loose or missing hardware.
damaged/worn, cracked,
Pivot
or hardware is loose or
missing.
0060-6
03/15/2011Rel(1.10)root(pmcswp)wpno(I582059)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.