TM 9-3950-253-13&P
0060
Table 1. Operator Preventive Maintenance Checks and Services (PMCS), Including Lubrication
Instructions for the E-CHU - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
Figure 8. Right-Side Transport Lock.
17
Before
Stowage
1. Check for hydraulic fluid under stowage assembly.
Any Class III hydraulic
Assembly Right
If hydraulic fluid is found, identify source of leak.
fluid leaks are visible.
Side - Overall
View
2. Check stowage assembly for signs of damage and
Stowage assembly
missing parts.
inoperative due to
damage or missing parts.
3. Remove any dirt or debris in and around stowage
assembly.
03/15/2011Rel(1.10)root(pmcswp)wpno(I582059)