TM 9-3950-253-13&P
0060
Table 1. Operator Preventive Maintenance Checks and Services (PMCS), Including Lubrication
Instructions for the E-CHU - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
Figure 13. Right-Side Stowage Lubrication.
NOTE
29
Monthly
Lift Frame - Lift
Frame
If time and mission allows, fully deploy lift
frame and perform checks as instructed.
1. Apply Grease, Automotive and Artillery, GAA
a. Stowage roller (LH and RH).
b. Stowage roller locking and pivot pin (LH and
RH).
2. Apply Grease, Automotive and Artillery, GAA
a. Upper lock slide area.
b. Container locking pin.
03/15/2011Rel(1.10)root(pmcswp)wpno(I582059)