TM 9-3950-253-13&P
0060
Table 1. Operator Preventive Maintenance Checks and Services (PMCS), Including Lubrication
Instructions for the E-CHU - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
Figure 9. Right-Side Overall View.
NOTE
18
Before
Lift Frame - Lift
Frame
If time and mission allows, fully deploy lift
frame and perform checks as instructed.
1. Check right and left lift frame stands for excessive
Frame stand is
damage or wear, or missing or damaged attaching/
excessively damaged or
locking hardware.
worn, or attaching/locking
hardware is missing or
damaged.
2. Unstow lift frame to verify proper operation
Front lift frame cannot be
properly unstowed.
3. Fully deploy E-CHU placing lift frame on level
Front lift frame cannot be
fully deployed.
19
Before
Lift Frame - Lift
1. Verify proper operation of upper locks (WP 0007).
Upper locks do not
Frame on Level
operate properly.
Ground
2. Check bail bar for excessive damage or wear, or
Bail bar is excessively
loose or missing hardware.
damaged or worn, or
hardware is loose or
missing.
03/15/2011Rel(1.10)root(pmcswp)wpno(I582059)