• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 286 of 720
'Unknown' by Unknown - Page 288 of 720

PALLETIZED LOAD SYSTEM TRUCK, M1075 AND M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 ENHANCED CONTAINER HANDLING UNIT
Page Navigation
  208    209    210    211    212  213  214    215    216    217    218  
img
. . . . .
TM 9-3950-253-13&P
0060
Table 1. Operator Preventive Maintenance Checks and Services (PMCS), Including Lubrication
Instructions for the E-CHU - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
Figure 7. Right Twistlock Assembly.
13
Before
Stowage
Verify proper operation of air transport lifting pin
Assembly Right
(WP 0091). Notify Field Maintenance if air transport
Side - Air
lifting pin does not operate correctly.
Transport Lifting
Pin
14
Before
Stowage
Verify proper operation of transport lock (WP 0008).
Verify proper operation of
Assembly Right
transport lock (WP 0006).
Side - Transport
Lock
15
Before
Stowage
1. Verify proper operation of transport lock adjustable
Transport lock adjustable
Assembly Right
strut (WP 0008).
strut does not operate
Side - Transport
correctly.
Lock Adjustable
Strut
2. Check transport lock adjustable strut fasteners and
Transport lock adjustable
mounting hardware for excessive damage or wear, or
strut is excessively
missing or damaged hardware.
damaged or worn, or
fasteners or mounting
hardware is missing or
damaged.
16
Before
Stowage
Check shear latch for excessive damage or missing or
Shear latch is excessively
Assembly Right
damaged mounting hardware. Notify Field
damaged or mounting
Side - Shear
Maintenance if shear latch or mounting hardware is
hardware is missing or
Latch
missing or damaged.
damaged.
0060-9
03/15/2011Rel(1.10)root(pmcswp)wpno(I582059)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.