TM 9-3990-260-14&P
7-18.
PREPARATION FOR STORAGE OR SHIPMENT (CONT).
(5)
Refer to Appendix K and perform all lubrication procedures.
(6)
Schedule the next PMCS on DD Form 314, Preventive Maintenance Schedule and Record.
(7)
Report all deficiencies on DA Form 2407 if the deficiencies appear to involve unsatisfactory
design.
(8)
Spot paint all surfaces as necessary (TB 43-0209).
b.
Preparation for Shipment.
(1)
(2)
Refer to AR 746-80 for Marking of Supplies for Shipment.
(3)
Refer to AR 725-5 and prepare all shipping documents to accompany M3A1 CROP.
(4)
Refer to TM 9-2300-281-35, Standards of Overseas Shipment or Domestic Issue of Special
Purpose Vehicles, if M3A1 CROP is to be shipped overseas.