TM 9-3990-260-14&P
b. Installation.
(1) Install four shim plates (5) to container transport lock (2).
(2) Install cables (4) thru shim plates (5) and latch (6) and install seizing band (7).
(3) Install cable (3) thru ring of locking pin (1) and install seizing band (8).
(4) Position latch (6) in retracted position and install locking pin (1) thru shim plates (5) and latch (6).
c. Follow-on Maintenance. None.