TM 55-8115-202-14
b. Steel Parts. Apply two coats of olive drab,
c. Decontamination. Procedures required b,
rust-inhibiting, semi-gloss lacquer per MIL-L- 52043,
TM 743-200 shall apply.
Color 24087 per FED-STD-595.
c. Aluminum Paris. Apply one coat of olive drab
a. General. Apply paint only for the protection of
semi-gloss paint conforming to FED-STD-595, Color
base metal. Clean and treat surfaces which require
Chip 24037.
paint in accordance with MIL-T-704.
Section IV. REMOVAL AND INSTALLATION OF MAJOR COMPONENTS AND AUXILIARIES
CAUTION
5-10. General
Be careful in removing roof
The refrigerated container has two container has
angles and zee. They are adhered
two auxiliary components and six major components
to foam insulation.
which require special removal and installation
procedures.
(2) Installation. Installation is essentially the r-
everse of removal except as follows:
5-11. Auxiliary 7component3.
(a) Use new butyl rubber gasketing between
roof panel edges and container box frame.
for removal and installation procedures.
NOTE
65 for removal and installation procedures.
Gasketing is 3M Co. sealant tape,
1202T.
(b) Use new foam rope gasket around roof panel outer
The major components consists of the roof, sides,
edges and seal in-place with a sealant.
front, ribbed flooring, and floor. Except for the ribbed
flooring, all these components are one-piece, composite
NOTE
Recommended sealant is Dow-
panel are fastened to the contained box assembly frame
Corning 732 RTV; rope gasket is
with Camtainer fasteners. The ribbed flooring fits over
Dow-Chemical
polyethylene
the floor panel.
ethafoam, 1/2 inch dia.
a. Roof.
b. Sides.
(1) Removal.
(1)
Removal
(a) Remove upper front and side corner
NOTE
Step (a) applies to removal of
right side panel only.
(b) Remove sealant and foam rope gaske t
around roof panel outer edges.
(a) Remove interior light and switch, and
(c) Remove sealant and foam rope gasket
conduit.
around roof panel outer edges.
(d) Use slings and hoist to remove roof
d)
(e) Remove butyl rubber gasketing stuck to
(c) Remove side corner angles, the wall zee,
container box frame.
(d) Support side and remove Camtainer
fasteners around edges.