TM 10-3930-641-34-2
ARTICULATED HITCH DISASSEMBLY/ASSEMBLY (CONT)
(Sheet 14 of 16)
LOCATION/ITEM
ACTION
REMARKS
33.
Hydraulic jack
Put in position under rear of front main frame.
34.
Front main frame
Position in articulated joint.
35.
Pin (17)
Install in lower pivot.
36.
Pin (5)
Place in position in upper pivot joint.
37.
Retainer (4)
Place into position one pin (5). Using three
2-1/2 inch long capscrews align holes in re-
tainer with holes in top of pin (5).
38.
Pin (5)
Install.
39.
Shipping link
Connect.
NOTE
See TM 10-3930-641-20.
Vehicle used for positioning front main frame
may be removed at this time.
40.
Long capscrews (installed in step 37)
Remove and install original capscrews (2).
41.
Capscrews (2)
Torque in sequence:
a.
Tighten to a torque of 65 lb. ft. to 85 lb.
ft. (88-115.2 N-m).
b.
Hit joint until torque is less than 40 lb. ft.
(54.2 N.m).
c.
Tighten to a torque of 65 lb. ft. to 85 lb.
ft. (88-115.2 N.m).
d.
Hit joint until torque is less than 60 lb. ft.
81.3 N.m).
e.
Tighten to a torque of 65 lb. ft. to 85 lb.
ft. (88-115.2 N.m).
Go on to Sheet 15
6-49