TM 10-3930-675-10-1
PREPARATION FOR TRANSPORT - CONTINUED
0007 00
PLACING CAB IN TRANSPORT POSITION - CONTINUED
WARNING
DO NOT stand between the tires and the fenders when installing retaining pins. Failure to follow this
warning could result in injury or death.
m.If removed, install retaining pins in left and right boom support locking pin extensions.
n. Install handrail with two retaining pins.
PLACING BOOM SUPPORT IN TRANSPORT POSITION
0007 00
NOTE
Boom must be raised to 19 degrees (as shown on bottom of ECS display, Boom and Tophandler Lift
Angle screen) and extended to 110 in. (279 cm) (as shown on ECS display, Boom Extension screen). To
get to 19 degrees, tophandler will have to be left in normal operating position and turned to longitudi-
nal position after locking pins are retracted and boom support is folded.
Fold Boom Support.
1.
a. If not previously removed, remove retaining pin from boom support locking pin extension on each side of boom sup-
port.
BOOM SUPPORT BOOM
RETAINING
BOOM SUPPORT
RETAINING
BOOM SUPPORT
SUPPORT
PIN
LOCKING PIN
PIN
LOCKING PIN
434-10006
BOOM SUPPORT
BOOM SUPPORT
LOCKING PIN EXTENSION
LOCKING PIN EXTENSION
(RETRACTED)
0007 00-6